Power Grid: Québec/Baden-Württemberg - Strategy
$18.99
- Stock: In Stock
- Reward Points: 19
- Model: BGNM3773
Enter your email address below and we will notify you as soon as the product is available again.
Email
The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.
In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.
In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins.
Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.
Incorporates maps from:
Mégawatts
Funkenschlag: EnBW
In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.
In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins.
Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.
Incorporates maps from:
Mégawatts
Funkenschlag: EnBW
General | |
Players | 2 - 6 players |
Age | 13+ years |
Time | 120 - 120 mins |
Designers | Friedemann Friese |
Artists | Lars-Arne "Maura" Kalusky |
Mechanism | Auction/Bidding, Income, Market, Network and Route Building |
Year Published | 2012 |
Difficulty | 3.1/5 |
Game Type | Competitive |
Rating | 7.8/10 |
BGG Link | Click Here |